国产精品亚洲免费视频,欧美精品亚洲精品日韩专区一^方,国产精品99久久久久久人,韩国理论电影在线观看

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Ten wastes in injection molding process

Release time:2024-08-01

Injection moldingIf the production link is not careful, it will cause various losses, which requires the injection molding factory to control each processing procedure and have a perfect processing system. Through more than 10 years of injection molding processing experience, the injection molding factory has formed a perfect processing process, and summed up the ten wastes in the injection molding process, efficient production and cost saving.

2.jpg


(1) The structure design of the injection mold is unreasonable, which leads to multiple mold trials and mold changes, and large consumption of raw materials, electricity and labor;


(2) Burr produced by injection molding parts, large amount of post-processing and large labor loss;


(3) The awareness of using, repairing and maintaining injection molds is not strong, and there are many mold failures or even damages in the process of injection molding, which often leads to a waste of mold repair downtime;


(4) The use, repair and maintenance of the injection molding machine are not in place, which shortens the service life of the injection molding machine and wastes caused by the shutdown and repair of the machine;


(5) The personnel allocation in the injection molding workshop is unreasonable, the division of labor is not clear, the responsibilities are not clear, and no one is responsible, resulting in the injection molding process and production is not smooth, resulting in waste;


(6) The vocational skills training is not enough, and the working ability and quality of the employees are poor. Many problems will lead to waste;


(7) The management concept is backward, cannot keep pace with the times, does not learn, does not progress, and the injection molding process management level is low, resulting in low production efficiency of the injection molding process;


(8) The injection molding process control is not in place, the production waste is large, and the defective rate is high, resulting in the waste of batch return;


(9) The raw materials used in the process of mold test and injection molding exceed the plan, and the nozzle materials or rubber heads at the machine position are not strictly controlled, resulting in a large loss of plastic raw materials;


(10) Improper planning or mold arrangement in injection molding production, frequent mold change or machine change, resulting in "material", "labor" and "cost" losses.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
万荣县| 滨州市| 涞源县| 托克托县| 四川省| 灵武市| 沙湾县| 涟源市| 肥西县| 固镇县| 深泽县| 喜德县| 北海市| 苏尼特左旗| 绥宁县| 油尖旺区| 牡丹江市| 台南县| 花垣县| 客服| 陆川县| 武胜县| 永吉县| 太和县| 内江市| 广水市| 延长县| 平果县| 武威市| 察雅县| 即墨市| 元阳县| 富蕴县| 彩票| 青州市| 繁峙县| 凤凰县| 荣成市| 新乡市| 泌阳县| 洛隆县|